Page images
PDF
EPUB

From the head of the Long Stairs a new path with easy grades and short flight of reinforced concrete stairs have been built.

From the end of the Indian Trail, connecting Lookout Point, another flight of reinforced concrete stairs has been built, complete except the hand rail.

The slide of gravel near the entrance to the Glen has been effectually checked by placing in it logs and brush fastened with No. 6 wire.

A supply of drinking water has been provided at the entrance to the Glen from the village mains and at Suspension bridge from springs.

These and many other minor changes have already greatly increased the safety and facility of traversing the Glen, and have been greatly appreciated by the public.

In the absence of mechanical means for counting the visitors to the Glen, their number can only be estimated. In the opinion of the superintendent, at least 45,000 persons went through the Glen last season.

Following is a statement of expenditures to February 1, 1908.

[blocks in formation]

CREDIT.

October 10, 1907.

1. Geo. C. Wait,* advanced for pay-roll.....

$210 84

2. J. E. Frost, 2d, Supt., salary, July 15-
August 15....

83 33

3-4. Pay-roll for labor...

95 20

5. L. II. Durland, Son & Co., garbage cans, etc.

26 20

[blocks in formation]

10-38. Part of pay-roll for labor in September.. 39. Woodward & Stouffer, cement and hardware 40. C. S. & C. H. Frost, hardware, blacksmithing, etc..

762 65

179 95

197 63

41. Geo. C. Harding, chisels, etc...

3 30

42. L. H. Durland, Son & Co., cement, etc...
43. J. P. Drake, lumber, cement, etc....
44. J. E. Frost, 2d, Supt., salary August 15-
September 15...

45-46. Balance of pay-roll for September.

47. Polhemus Printing Co., New York, 1 cash

book ..

48. J. B. Lyon Co., Albany, vouchers...
49. Geo. F. Barton, Montour Falls, plans and
specifications

December 9, 1907.

50-85. Part of pay-roll for labor in October.

51 80

212 01

83 33 170 25

350 4 32

45 80

991 00

86. L. H. Durland, Son & Co., cement, etc...

384 05

87. Woodward & Stouffer, cement, nails, etc...

276 16

88. James P. Drake, lumber..

235 32

89. C. S. & C. H. Frost, iron and steel..

53 29

90. J. E. Frost, 2d, Supt., salary, September

15-October 15.....

83 33

91-98. Part of pay-roll for labor in October......

363 40

*Residence of payees, Watkins, N. Y., unless otherwise stated.

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
« PreviousContinue »