" JUSTIFICATION The project is a unit of the comprehensive plan for flood control on the West Branch Susquehanna River. Together with the George B. Stevenson Dam (First Fork) constructed by the Commonwealth of Pennsylvania and other dams authorized for... "
Report of the Chief of Engineers U.S. Army - Page 68
by United States. Army. Corps of Engineers - 1946
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1948 - 1602 pages
...the periods of high river stages. The estimated cost of construction, revised in 1946, is $270,000. The project is a unit of the comprehensive plan for...Control Act approved June 28, 1938. Local cooperation. — Fully complied with. Operations and results during fiscal year. — Construction of the project...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1946 - 1442 pages
...relocations, revised in 1946. The estimated annual cost of maintenance (operating and care), is $18,500. The project is a unit of the comprehensive plan for flood control and other purposes in the Merrimnck River Basin which was authorized by the Flood Control Act approved June 22,...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1945 - 1000 pages
...have been hitherto subject to frequent extended inundation. The existing project was authorized by the Flood Control Act approved June 22, 1936, and modified by the Flood Control Acts approved June 28, 1938, and August 18, 1941. The estimated cost of new work, revised in 1941,...
Full view - About this book

Civil Functions, Department of the Army Appropriation Bill, 1949: Hearings ...

United States. Congress. Senate. Committee on Appropriations - Public works - 1948 - 1456 pages
...the project imd will carry the project to ahout 32 percent completion the end of fiscal year 194!). The project is a unit of the comprehensive plan for flood control In the >s Angeles County drainage area. It will afford protection to approximately >.000 acres of highly...
Full view - About this book

Civil Functions, Department of the Army Appropriation Bill, 1949, Hearings ...

United States. Congress. Senate. Appropriations Committee - 1948 - 1646 pages
...the project and will carry the project to about 32 percent completion at the end of fiscal year 1949. The project is a unit of the comprehensive plan for flood control in the Los Angeles County drainage area. It will afford protection to approximately 20.000 acres of...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1946 - 1312 pages
...estimated cost is $7,883,000, which includes construction, lands, damages, and highway relocations. The project is a unit of the comprehensive plan for...Control Act approved June 22, 1936, and modified by toe Flood Control Act approved June 28, 1938. Local cooperation. — Section 2 of the Flood Control...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1953 - 1112 pages
...$3,772,420.38. The estimated cost (1953) of annual maintenance is $65,000. The existing project was authorized by the Flood Control Act approved June 28, 1938. Local...approved June 28, 1938, applies. Operations and results dwring -fiscal year. Installation and testing of radio facilities for transmission of hydrologic data...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1949 - 1450 pages
...works in the town of North Andover and in two sections of the city of Lawrence, to be constructed as a unit of the comprehensive plan for flood control...Merrimack River Basin, which was authorized by the Food Control Act approved June 22, 1936, and modified by the Flood Control Act approved June 28, 1938....
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1948 - 1442 pages
...of high river stages. The estimated cost of construction, revised in 1946, is $270,000. The p_roject is a unit of the comprehensive plan for flood control...in the Merrimack River Basin, which was authorized bv the Flood Control Act approved June 22, 1936, and modified by the Flood Control Act approved June...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2

United States. Army. Corps of Engineers - Harbors - 1953 - 1396 pages
...selected for construction under the general authorization for the Ohio River Basin contained in the Flood Control Act approved June 28, 1938. Local cooperation. — Section 2 of the Flood Control Act approved June 28, 1938? applies. Local interests have indicated their willingness to participate...